Skip to content

Issues found when testing #370 #401

@Yaneida

Description

@Yaneida

-When the user tries to switch to another project, there is an error message that says: "There is another time entry in that date range" and the only thing that happens is the successfully clock-out.
-I consider the field "Project" should have the same size as the other fields.

Note: If we want to have some functionalities that allow you to switch/update projects working, we are ok with it(after fixing the issue above), but in the future, it should be more intuitive like the tsheet.

Metadata

Metadata

Assignees

Labels

bugSomething isn't workingmvpminimum viable product

Type

No type

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions