Skip to content

Open early reviews should be considered as reviews #2222

Description

@ietf-svn-bot

type_defect | by kivinen@iki.fi


I have document draft-ietf-i2nsf-problem-and-use-cases which has been assigned for early review for Derek Atkins. The review is not yet done, and now the document went to the last call, and the document was put for the assignment queue for new assignment. The assignment page did not show that there is already another review request for secdir in progress for that document, and did not reassign it to the same person (which would have been useless anyways, as he has not yet done previous review). It also did not close down the previous review.

I think it should most likely just suggest that I automatically close the previous early review for the document, and reassign it for the same reviewer for the last call review, or just modify the previous review request from early review to last call review.

The whole concept of having separate review types for early, last call and telechat is bit misleading, as those events just trigger when we want to do review assignments, but the time when the review comes in actually specifies whether it was early, last call, or telechat review.

I.e., if reviewer is assigned document during the early review time, and he does not do it then or during the last call time, but finishes the review for the latest draft after last call but before telechat, it should be considered as telechat review, not early review.


Issue migrated from trac:2222 at 2022-03-04 05:46:17 +0000

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions